Client
Bristol Grammar School
Main Contractor
Rydon Construction
Approx Value
Sector
Education

Description of Works:

Keyplan Engineering were appointed to carry out the design, supply, installation, testing & commissioning of the mechanical services to this new Performing Arts Centre / refurbishment to the connecting existing building. The finished buildings included new Music Classrooms, Music Rehearsal Space, Recording Booth, Band Room, Control Booth, Drama Room, Music Practice Rooms, Auditorium and Stage.

Systems & Services:

  • Domestic Hot and Cold Water Services
  • Mechanical Ventilation Services
  • Low Pressure Hot Water Heating Services  
  • Natural Gas Services
  • DX and VRV/F Air Conditioning
  • Building Management System (BMS)
  • Above Ground Drainage Services                                                  
  • Sanitaryware  
  • Thermal Insulation
  • Water Treatment
  • Commissioning

Systems & Services:

  • Domestic Hot and Cold Water Services
  • Mechanical Ventilation Services
  • Low Pressure Hot Water Heating Services  
  • Natural Gas Services
  • DX and VRV/F Air Conditioning
  • Building Management System (BMS)
  • Above Ground Drainage Services                                                  
  • Sanitaryware  
  • Thermal Insulation
  • Water Treatment
  • Commissioning
No items found.